PRODUCTS CENTER


Brunei Dimple Drainage Sheet Plastic Composite Drainage Board

Composite Drainage Board is a high-performance drainage material, made of polymer material and special additives.

Category:

BruneiComposite Drainage Board

Product Description

Introduction

HDPE Waterproof Dimpled  drainage Sheet  composite drainage board is a type of green roofing and foundation driange systems which are drained by a special molding plastic sheets. Water is retained and drained off within dimple on the upper sides of the drainage board; excess water spills over the edges of the plates and is carried off  from the roof or foundations.

The plastic or HDPE drainage board are made from HDPE(high-density polyethylene), using high pressure to inject plastic to form hole-lump-shaped shell, with stereo space and support level; in the top of the shell, covering with non-woven as filtering level for water percolation, water storage and water drainage

Video Showcase

 

Working Drawing

xiuhe xiuhe xiuhe xiuhe

1. Greening project: the storage roof greening, roof garden, vertical greening, roof greening, soccer pitches, golf course, etc.

2. Municipal engineering: airport, avenue embankment, subway, tunnel, landfill, etc.

3. Construction: the top or decrease constructing foundation, internal and backyard the basement wall, flooring and roof, roof seepage manipulate and warmth insulation layer, etc.

4. Water conservancy project: the reservoir seepage water, reservoir, lake water seepage control, etc.

5. Traffic engineering: highway, railway basement, roadbed, dam and slope safety layer, etc.

Specifications

ltem/Model DB08 DB10   DB12  DB16   DB20   DB25  DB30
Material HDPE
Dimple Height (mm) 8 10   12  16   20   25  30
Unit Weight  (g/m²)   1000 1100  1200 1400  1500  1600 1800
Thickness (mm)  0.7 0.8 0.9 1.0 1.1 1.1 1.2
Tensile Strength (KN/m) 3.5
Compressive Strength (>kpa) 300
Elongation >% 80
Longitudinal Drainage >cm²/s   10 10   10  15  15  20 20
Puncture Strength (KN) 0.35

Pack and Ship

Packaging: Standard packaging or customer's requirements

Lead time: Within 10-15 days after receiving the deposit payment

Producing Capacity: Two 40ft Containers per week

xiuhe xiuhe