PRODUCTS CENTER


Niger 3D Geomat Use for Water and Soil Conservation Slope Protection

3D Geomat is kind of new 3D structural geosynthetic product which is applied in water and soil Conservation

Category:

Niger3D Geomat

Product Description

Introduction

This 3D Mat features as a protecting reinforcing and built-in intermediate layer between herbal vegetation and soil. It offers safety above and under the waterline thereby developing a everlasting solution. Either seeded, crammed with topsoil or mulched, continues the fertile soil in vicinity and prevents the fill from being washed out. Vegetation quickly establishes itself with root structures that are bolstered via unique mat structure. can be used in many areas the place erosion takes place, such as watercourses, embankments, slopes and spillways.

is on hand as an open mat for dry slopes, or as a 'flatback' mat (with a flattened underside) for moist slopes and for use under the waterline.

Video Showcase

Applications

1). It can shop embankment from erosion by means of wind and rain till the turf is generated.
2). It can hold seed distribution evenly on the slope from the wind and rain to be lost.
3). Mat can take in giant quantities of warmness electricity to beautify geothermal, and promote the seed germination,
extend the boom length of plants.
4). The compound safety layer shaped via vegetation grown collectively can with stand excessive water degree and washout
of flow.
5).It can rather of concrete,asphalt ,stone and so on slope materials. Mainly used in highway, railway, river
channel, embankment and different slope floor protection.

Working Drawing

xiuhe xiuhe xiuhe xiuhe

Specifications

Specification

EM2

EM3

EM4

EM5

Weight per sq.m.≥(g/m2)

220

260

350

430

Thickness≥(mm)

10

12

14

16

Width≥(m)

2

Length≥(m)

30

Vertical tensile strength ≥(kN/m)

0.8

1.4

2

3.2

Horizontal tensile strength ≥(kN/m)

0.8

1.4

2

3.2

Remark: The special spec or size can be manufactured according to the demands of the contract or agreement

Pack and Ship

Packaging: Standard packaging or customer's requirements

Lead time: Within 10-15 days after receiving the deposit payment

Producing Capacity: Two 40ft Containers per week

xq xiuhe xq xq