Filament Non-woven Geotextile
- Commodity name: Filament Non-woven Geotextile
- Description
-
Introduction
Geotextile is a type of geotechnical material used in fields such as civil engineering, environmental engineering, and hydraulic engineering, mainly for the reinforcement, separation, filtration, and protection of soil. The construction methods of geotextiles can vary depending on specific projects and requirements. The following are general geotextile construction methods
Video Showcase
Applications
Land preparation: Before construction, it is necessary to prepare the construction area, including cleaning, leveling the land, removing weeds, foreign objects, etc., to ensure the cleanliness and flatness of the construction area.
Embedding geotextile: According to the design requirements, lay the geotextile on the construction area. Geotextiles can be directly laid on the surface of soil or tightly bonded to the soil. Keep the geotextile flat, tight, and evenly spread to ensure its effective engineering performance.
Working Drawing








Fixed geotextile: The geotextile needs to be fixed to ensure that it does not shift or loosen. The geotextile can be fixed on the soil surface or other structures using fixing methods such as nails, plastic/metal clips, steel wires, and ground beams.
Joint connection: If multiple geotextiles need to be used for covering or connecting, joint treatment is required. The joints can be connected by welding, stitching, or tape to ensure they are firm and seamless.
Monitoring and maintenance: After the installation of geotextiles is completed, monitoring is required to check the engineering performance and construction quality of geotextiles. At the same time, regular maintenance and upkeep should be carried out to ensure the long-term effective use of geotextiles.
It should be noted that the specific steps and methods of geotextile construction are influenced by factors such as geotextile type, engineering requirements, and soil conditions. Therefore, in actual construction, reasonable adjustments and operations need to be made according to specific circumstances. At the same time, relevant safety operation standards should be followed during the construction process to ensure the safety of construction personnel.
Specifications
Pack and Ship
Packaging: Standard packaging or customer's requirements
Lead time: Within 10-15 days after receiving the deposit payment
Producing Capacity: Two 40ft Containers per week




Testing equipment

FAQ
Q: What can you buy from us?
A: Geomembrane,Geogrid,Geocell, Geotextile, Geocomposite,
Q: Can I have a sample?
A: Yes. And sample free.
Q: What's the payment terms?
A: T/T or L/C. Others could be negotiated.
Q: What's the delivery time?
A: 3-20 days after confirming order, detail delivery date should be decided according to production season and order quantity.
Certificate


Keywords:
Related Products