HDPE plastic geocell erosion control and road construction
- Commodity name: HDPE plastic geocell erosion control and road construction
- Description
-
Introduction
HDPE geocell is a modular structure used in civil engineering, usually made of plastic materials, with an open honeycomb structure. Geogrids have various uses in civil engineering, including but not limited to the following aspects
Video Showcase
Applications
Roadbed reinforcement: Geogrids can be used for soil stabilization and reinforcement, improving soil bearing capacity, and reducing roadbed settlement and deformation.
Underground drainage: Geogrids can be used for underground drainage systems to promote the drainage and permeability of soil moisture, prevent soil liquefaction and deformation.
Greening engineering: As a soil substrate for plant growth, geogrids can promote plant growth and root growth, and are used for greening engineering and vegetation restoration.
Working Drawing








Slope stability: Geogrids can be applied to slope stability and protection, preventing slope erosion and collapse, and maintaining terrain stability.
Flood control and flood prevention: Through drainage channels and water storage functions, geogrids can be used for flood control and flood prevention projects, reducing the impact of rainfall on surface and groundwater systems.
Soil and water conservation: used for land protection and soil and water conservation projects, stabilizing soil, reducing soil erosion, and improving the ecological environment of the land.
Underground storage: Geogrids can also be used for underground storage systems, such as rainwater collection, underground reservoirs, etc., to utilize underground space for resource storage.
Overall, geogrids have good permeability, breathability, and stability, which can improve the mechanical properties of soil and improve the soil environment. They are widely used in various civil engineering projects.
Notes
(1) Other welding distance can be made;
(2)The special spec or size can be manufactured according to the demands of the contract
# Lin Yuan Geosynthetics reserves the right to change the product specifications at any time.
Pack and Ship
Packaging: Standard packaging or customer's requirements
Lead time: Within 10-15 days after receiving the deposit payment
Producing Capacity: Two 40ft Containers per week








Testing equipment

FAQ
Q: What can you buy from us?
A: Geomembrane,Geogrid,Geocell, Geotextile, Geocomposite,
Q: Can I have a sample?
A: Yes. And sample free.
Q: What's the payment terms?
A: T/T or L/C. Others could be negotiated.
Q: What's the delivery time?
A: 3-20 days after confirming order, detail delivery date should be decided according to production season and order quantity.
Certificate


Keywords:
Related Products