Fish Landfill for Aquaculture Pond Liner 1.5mm Black Smooth HDPE Geomembrane
- Commodity name: Fish Landfill for Aquaculture Pond Liner 1.5mm Black Smooth HDPE Geomembrane
- Description
-
Introduction
Our excessive density polyethylene (HDPE) geomembranes furnish an impermeable barrier towards a wide vary of solids and liquids. They showcase awesome chemical and UV resistance,impermeability, and excessive yield and welded seam strengths, which is broadly used as the liner.(model in accordance to the thickness of distinction, extraordinary thickness and specific price) manufacturing capacity: thickness:0.1 mm -6 mm, width: 1-8 meters. It is appropriate for seepage manage in unique industries, and is extensively used for aquaculture, seepage control, reservoirs or sewage remedy ponds.
Video Showcase
Applications
- Prevent leakage disposal in waste burying area or waste water or waste dregs disposing field,river bank,lake dam, mine
- remainings, reservior, tunnel, liquid storage
- Preventing leakage in subway, basement, tunnel, hole
- Anti-solt leakage in roadbed and different groundtill
- The aircraft course laying of dam, the vertical route laying fou groundtill, used in the development fence and waste
- material field
- Used in seawater or freshwater feed field, groundtill of road, highway, railway and water resistant layer of swelling clay and moist collapsed loess
Working Drawing








Specifications
❶ Thickness: 0.2mm-3.0mm
❷ Width:1-10m
❸ Colour: black, green, blue, yellow
# Geosynthetics reserves the right to change the product specifications at any time.
Pack and Ship
Packaging: Standard packaging or customer's requirements
Lead time: Within 10-15 days after receiving the deposit payment
Producing Capacity: Two 40ft Containers per week






Testing equipment

FAQ
Q: What can you buy from us?
A: Geomembrane,Geogrid,Geocell, Geotextile, Geocomposite,
Q: Can I have a sample?
A: Yes. And sample free.
Q: What's the payment terms?
A: T/T or L/C. Others could be negotiated.
Q: What's the delivery time?
A: 3-20 days after confirming order, detail delivery date should be decided according to production season and order quantity.
Certificate


Keywords:
Related Products