PP Short Fiber Non-Woven Geotextile with Thermal Bonded UV Resistance
- Commodity name: PP Short Fiber Non-Woven Geotextile with Thermal Bonded UV Resistance
- Description
-
Introduction
PP non woven geotextile made of Polypropylene stable fiber by nonwoven needle punched manufacture process. without chemical additives and heat treatment. It is an environmentally friendly construction material.
Geotextiles Products as protection, filtration, or separation layer alternative to diverse terrain such as soil, rock, sand, and so on. Also can be treated by UV Resistance, Thermal Bonded, Color Custom-made, etc.Video Showcase
Applications
1. Reinforcement in retaining wall backfill.
2. Strengthen the weak road and fix the cracks on the road.
3. Improve the stability of slope and reinforcement soil, avoid water and soil loss, and soil frozen injuries.
4. Isolation layer of artificial backfill soil stone with foundation and different tundra.
5. Filtration layer of drainage pipe or gravel sub-drain.
6. Vertical or horizontal drainage; Bury in the soil to release air pressure.
7. Reinforce the weak foundation of engineering roads, railways, embankments, and airports.Working Drawing







Short fiber PP geotextile is a common geotechnical material, which is composed of polypropylene (PP) short fibers that are combined by needle punching or melting.
Specifications
Notes
(1) MD = Machine Direction; TD = Transverse Direction;
(2)Roll width can be 1m, 2m,3m,3.95m,5.95m or as per customized.
# Lin Yuan Geosynthetics reserves the right to change the product specifications at any time.
Pack and Ship
Packaging: Standard packaging or customer's requirements
Lead time: Within 10-15 days after receiving the deposit payment
Producing Capacity: Two 40ft Containers per week



Testing equipment

FAQ
Q: What can you buy from us?
A: Geomembrane,Geogrid,Geocell, Geotextile, Geocomposite,
Q: Can I have a sample?
A: Yes. And sample free.
Q: What's the payment terms?
A: T/T or L/C. Others could be negotiated.
Q: What's the delivery time?
A: 3-20 days after confirming order, detail delivery date should be decided according to production season and order quantity.
Certificate


Keywords:
Related Products