3D Drainage Geomat/Erosion Control Mat Em4 for Philippines
- Commodity name: 3D Drainage Geomat/Erosion Control Mat Em4 for Philippines
- Description
-
Introduction
3D geomat is a kind of 3D network structure made of high molecular synthetic material. It is applied to plant and fix soil with loose texture and leaves 90% space to fill earth, sand and stones. Plant roots can go across it, and grow comfortably. Turf after growing can let mat, grass and earth be combined together firmly. Plant roots can deep 30-50cm under the land surface, so it forms a layer of solid green composite protecting layer.
It prevents the slope rock from falling down, which avoids the hurt to the human beings and the vehicle on the road, It prevents the road dregs packed by geonet from being washed away, avoids the roadbed distortion and improves the stability of the roadbed, laying the geonet reinforces the road surface, avoids development of the reflection crack. As reinforcing material of filling soil in retaining walls, it disperses the earth body stress and restricts the side-displacement. The stone cage, made of geonet, can prevent erosion, collapsing and lost of water and soil when being used in dyke and rock slope protetion.
Video Showcase
Applications
- Before the greensward grows, it prevents the surface of the land from the erosion of the wind and rain.
- Form compound protection layer with the plant , standing the wash-out of the high water level and large speed current.
- Replace the concrete, asphalt, and block, using in the slope surface protection of roadway, railway, river-way, dyke, and the hillside, etc.
- The mat can absorb thermal energy abundantly, increase ground wet, promote seed sprout, and prolong growth term of plant
- As a substitute for concrete or stonewalls for slope protection.
- As an integrated erosion control system on steep slopes and erosion prone areas.
- To prevent erosion on river embankments, channels and flood plains.
- To re-vegetate the sides of roadways and landfill sites.
- To ensure a stable cover necessary to protect geo-membranes from UV radiation.
Working Drawing




Specifications
Pack and Ship
Packaging: Standard packaging or customer's requirements
Lead time: Within 10-15 days after receiving the deposit payment
Producing Capacity: Two 40ft Containers per week




Testing equipment

FAQ
Q: What can you buy from us?
A: Geomembrane,Geogrid,Geocell, Geotextile, Geocomposite,
Q: Can I have a sample?
A: Yes. And sample free.
Q: What's the payment terms?
A: T/T or L/C. Others could be negotiated.
Q: What's the delivery time?
A: 3-20 days after confirming order, detail delivery date should be decided according to production season and order quantity.
Certificate


Keywords:
Related Products