



China HDPE Waterproof Composite Geomembrane Factory/Supplier/Wholesale for Tunnel Railway
- Commodity name: China HDPE Waterproof Composite Geomembrane Factory/Supplier/Wholesale for Tunnel Railway
- Description
-
Introduction
Composite geomembrane is a kind of geosynthetic cloth composed of exclusive materials, normally composed of two or extra layers of substances mixed thru a composite process. Composite geomembrane has twin or a couple of functions, combines the benefits of a range of materials, and is broadly used in civil engineering. Composite geomembrane is a geosynthetic fabric composed of extraordinary materials, typically composed of two or extra layers of substances mixed via composite technology. Composite geomembranes have dual or more than one functions, combining the blessings of a number of materials, and are extensively used in civil engineering
Video Showcase
Material: Composite geomembrane is commonly composed of artificial substances such as polyethylene, polypropylene, polyester, polyvinyl chloride, etc., and is made via composite technology.
Structure: Composite geomembrane has a multi-layer structure, and every layer of fabric has unique functions, such as anti-seepage, tensile, anti-corrosion, etc.
Function: Composite geomembrane has a number functions, such as anti-seepage, isolation, tensile strength, chemical corrosion resistance, etc. It can play a position in water conservancy engineering, environmental engineering, municipal engineering, and different fields.
Application: Composite geomembranes are broadly used in engineering tasks such as reservoirs, dams, landfills, chemical ponds, and street foundations, for functions such as anti-seepage, isolation protection, and soil stability.
Advantages: Composite geomembrane has tremendous anti-seepage performance, tensile performance, and chemical corrosion resistance, which can defend land resources, keep the water and soil environment, and enhance the steadiness of engineering structures.
Working Drawing
Pack and Ship
Packaging: Standard packaging or customer's requirements
Lead time: Within 10-15 days after receiving the deposit payment
Producing Capacity: Two 40ft Containers per week
Testing equipment
FAQ
Q: What can you buy from us?
A: Geomembrane,Geogrid,Geocell, Geotextile, Geocomposite,
Q: Can I have a sample?
A: Yes. And sample free.
Q: What's the payment terms?
A: T/T or L/C. Others could be negotiated.
Q: What's the delivery time?
A: 3-20 days after confirming order, detail delivery date should be decided according to production season and order quantity.
Certificate
Keywords:
Related Products