




Virgin and Recyled HDPE Geomembrane Composite Drainage Board
- Commodity name: Virgin and Recyled HDPE Geomembrane Composite Drainage Board
- Description
-
Introduction
A Composite Drainage Board is a kind of drainage machine used in building and civil engineering projects. It is usually made up of more than one layers of substances designed to successfully manipulate water runoff and forestall waterlogging in a number of applications, such as inexperienced roofs, keeping walls, underground structures, and landscaping projects.
Drainage board is the board with stiffened concave-convex hollow-structure nub produced by way of nice high-density polyethylene in the science of warm melting and extrusion. The product ought to discharge rainwater shortly and effectively,greatly decrease or even dispose of the hydroststic strain of water-resistant layer,the essential welding ought to additionally advantage water-proof layer,the crucial welding should additionally gain waterproof.This initiative drainage principle should gain initiative water resistant effect.
Video Showcase
Working Drawing
After the development of the water-proof layer and its protecting layer is completed, start laying the drainage board. Require the slope of grassroots drainage to meet a vary of two ‰ to 5 ‰;
2. Lay the drainage board with the cup fashioned mouth going through upwards and the enamel interlocked;
3. Cover the drainage board with geotextile, overlapping 10-20cm to stop mud and water from passing thru the geotextile, clogging the water storage and drainage system, inflicting negative drainage and decreased water storage capacity;
4. Lay 10-20mm medium coarse sand on the geotextile to shape a permeable filter layer, which can forestall the loss of planting soil;
5. Cover with splendid thickness of planting soil.
6. It is indispensable to make sure the safety of completed drainage boards. After the set up of the drainage board, it need to now not be allowed to at once push hand carts on the drainage board. When transpSpecifications
Pack and Ship
Packaging: Standard packaging or customer's requirements
Lead time: Within 10-15 days after receiving the deposit payment
Producing Capacity: Two 40ft Containers per week
Testing equipment
FAQ
Q: What can you buy from us?
A: Geomembrane,Geogrid,Geocell, Geotextile, Geocomposite,
Q: Can I have a sample?
A: Yes. And sample free.
Q: What's the payment terms?
A: T/T or L/C. Others could be negotiated.
Q: What's the delivery time?
A: 3-20 days after confirming order, detail delivery date should be decided according to production season and order quantity.
Certificate
Keywords:
Related Products