150GSM 100% Short Fiber Non Woven Needle Punched PP Geotextile
- Commodity name: 150GSM 100% Short Fiber Non Woven Needle Punched PP Geotextile
- Description
-
Introduction
PP non woven geotextile made of Polypropylene steady fiber via nonwoven needle punched manufacture process. besides chemical components and warmth treatment. It is an environmentally pleasant building material.
Geotextiles Products as protection, filtration, or separation layer choice to numerous terrain such as soil, rock, sand, and so on. Also can be handled by way of UV Resistance, Thermal Bonded, Color Custom-made, etc.
Video Showcase
Applications
1. Reinforcement in maintaining wall backfill.
2. Strengthen the susceptible street and repair the cracks on the road.
3. Improve the steadiness of slope and reinforcement soil, keep away from water and soil loss, and soil frozen injuries.
4. Isolation layer of synthetic backfill soil stone with basis and specific tundra.
5. Filtration layer of drainage pipe or gravel sub-drain.
6. Vertical or horizontal drainage; Bury in the soil to launch air pressure.
7. Reinforce the susceptible basis of engineering roads, railways, embankments, and airports.Working Drawing







Short fiber PP geotextile is a common geotechnical material, which is composed of polypropylene (PP) short fibers that are combined by needle punching or melting.
Specifications
Notes
(1) MD = Machine Direction; TD = Transverse Direction;
(2)Roll width can be 1m, 2m,3m,3.95m,5.95m or as per customized.
# Lin Yuan Geosynthetics reserves the right to change the product specifications at any time.
Pack and Ship
Packaging: Standard packaging or customer's requirements
Lead time: Within 10-15 days after receiving the deposit payment
Producing Capacity: Two 40ft Containers per week



Testing equipment

FAQ
Q: What can you buy from us?
A: Geomembrane,Geogrid,Geocell, Geotextile, Geocomposite,
Q: Can I have a sample?
A: Yes. And sample free.
Q: What's the payment terms?
A: T/T or L/C. Others could be negotiated.
Q: What's the delivery time?
A: 3-20 days after confirming order, detail delivery date should be decided according to production season and order quantity.
Certificate


Keywords:
Related Products