450g PP Woven Geotextiles Geobags Factory Price Geotextile Bag Geotube
- Commodity name: 450g PP Woven Geotextiles Geobags Factory Price Geotextile Bag Geotube
- Description
-
Introduction
Dewatering containers are an effective dewatering technology fabricated from a specially engineered textile which provides confinement of the fine solids inside the container, while allowing water to permeate through the engineered textile. As the water drains, the solids continue to densify and consolidate over time. Once the solids are fully consolidated or have met minimum requirements for transport, several options are available for disposal of the dewatered material.
Containers are prefabricated using high strength and quality seaming techniques into tubular, bag-like, or other forms with filling ports or other provisions for site filling. The containers are custom sized to save land space and are ideal for areas where space is a constraint. Geotube dewatering containers are designed to optimize the solids retention and effluent discharge rate and quality making it a highly efficient and environmental friendly solution for various sludge dewatering applications.
Video Showcase
Applications
Step 1: Filling -- Sludge (dredged material) is pumped into the Geotube container. Environmentally-safe polymers are added to the sludge, which makes the solids bind together and water separate. The Geotubecontainer's unique fabric confines the fine grains of the material.
Step 2: Dewatering -- Clear effluent water simply drains from the Geotube container through the small pores in the specially engineered textile. This results in effective dewatering and efficient volume reduction of the contained materials. And this volume reduction allows for the repeated filling of the Geotube container. Over 99% of solids are captured, and clear filtrate can be collected and recirculated through the system. The decanted water is often of a quality that can be reused/returned for processing or returned to native waterways without additional treatment.
Step 3: Consolidation -- After the final cycle of filling and dewatering, the solids remain in the bag and continue to densify due to desiccation as residual water vapor escapes through the fabric. Volume reduction can be as high as 90 percent. When full, the Geotube container and contents can be deposited at a landfill, remain on-site, or the solids can be removed and land-applied when appropriate.Working Drawing








Specifications
Pack and Ship
Packaging: Standard packaging or customer's requirements
Lead time: Within 10-15 days after receiving the deposit payment
Producing Capacity: Two 40ft Containers per we


Testing equipment

FAQ
Q: What can you buy from us?
A: Geomembrane,Geogrid,Geocell, Geotextile, Geocomposite,
Q: Can I have a sample?
A: Yes. And sample free.
Q: What's the payment terms?
A: T/T or L/C. Others could be negotiated.
Q: What's the delivery time?
A: 3-20 days after confirming order, detail delivery date should be decided according to production season and order quantity.
Certificate


Keywords:
Related Products