4(1720419293568).jpg
15(1720419293322).jpg
16(1720419293354).jpg
17(1720419293538).jpg
+
  • 4(1720419293568).jpg
  • 15(1720419293322).jpg
  • 16(1720419293354).jpg
  • 17(1720419293538).jpg

Factory Price Geotextile Bag High Strength PP Woven Geotube

Geopipe bags are a professionally designed and made environmentally friendly material with a variety of excellent properties.
  • Commodity name: Factory Price Geotextile Bag High Strength PP Woven Geotube

Category:

  • Description
  • Introduction

    Geotextile tubes are made by PP woven fabric in a variety of sizes and lengths. They are in extra wide sizes with greater load distribution to resist punching and protect the embankment and foundation. Geotextile tubes are not only used to form shoreline structure including form temporary breakwaters, headlands, revetment on sand beach, also used in environment protection, like fill in the pollution silt, they let the water come out and retain the solid articles.

    Video Showcase

     

    Applications

    Step 1: Filling Sludge (slurry material) is pumped into the Geotube container. Environmentally-safe polymers are added to the sludge, which makes the solids bind together and water separate. The Geotube container's unique fabric confines the fine grains of the material.

    Step 2: Dewatering Clear effluent water simply drains from the Geotube container through the small pores in the specially engineered textile. This results in effective dewatering and efficient volume reduction of the contained materials. The volume reduction allows for repeated filling of the Geotube container. Over 99% of solids are captured, and clear filtrate can be collected and recirculated through the system. The decanted water is often of a quality that can be reused/returned for processing or returned to native waterways without additional treatment.

    Step 3: Consolidation After the final cycle of filling and dewatering, the solids remain in the bag and continue to densify due to desiccation as residual water vapor escapes through the fabric. Volume reduction can be as high as 90 percent. When full, the Geotube container and contents can be deposited at a landfill, remain on-site, or the solids can be removed and land-applied when appropriate.

    Working Drawing

    xiuhe xiuhe xiuhe xq
    xiuhe xiuhe xiuhe xiuhe

     

    Specifications

    Item Test Method Unit GT270PP GT300PP GT350PP GT400PP GT500PP
    Tensile Strength(MD) ASTM D4595 kN/m 55 65 70 80 84
    Tensile Strength(TD) ASTM D4595 kN/m 50 55 70 80 105
    Tensile Elongation(MD/TD) ASTM D4595 % 18 18 18 18 18
    Tensile Strength @2%Strain(MD) ASTM D4595 kN/m 11 13 14 16 16.8
    Tensile Strength @2%Strain(TD) ASTM D4595 kN/m 10 11 14 16 21
    Tensile Strength @5%Strain(MD) ASTM D4595 kN/m 22 26 28 32 33.6
    Tensile Strength @5%Strain(TD) ASTM D4595 kN/m 20 22 28 32 42
    The seam strength ASTM D4884 kN/m 25 27.5 35 40 52.5
    CBR Burst Strength ASTM D6241 kN 5.8 7 8 9.3 10.5
    Pore Size Ogo ASTM D4751 mm 0.43 0.43 0.43 0.43 0.43
    Water Flow Qioo ASTM D4491 L/m2/min 2037 1630 1222 815 611
    U.V.Resistance ASTM D4355 % 80 80 80 80 80
    Weight ASTM D5261 g/m2 270 300 350 400 500

    Pack and Ship

    Packaging: Standard packaging or customer's requirements

    Lead time: Within 10-15 days after receiving the deposit payment

    Producing Capacity: Two 40ft Containers per we

    xiuhe xiuhe

     

Testing equipment

xiuhe

FAQ

Q: What can you buy from us?

A: Geomembrane,Geogrid,Geocell, Geotextile, Geocomposite,

Q: Can I have a sample?

A: Yes. And sample free.

Q: What's the payment terms?

A: T/T or L/C. Others could be negotiated.

Q: What's the delivery time?

A: 3-20 days after confirming order, detail delivery date should be decided according to production season and order quantity.

Certificate

xq

xq

Keywords:

Online Consultation

SUBMIT

Related Products