Dam protection Geotube

Geopipe bags are a professionally designed and made environmentally friendly material with a variety of excellent properties.
  • Commodity name: Dam protection Geotube

Category:

  • Description
  • Introduction

    Geotube is a bag like structure made of geotextile, typically used in earthworks, dam protection, soil stabilization, and slope safety projects. Its fundamental makes use of encompass the following aspects;

    Hydraulic engineering: Geobags can be used for dam safety and flood manipulate engineering in hydraulic engineering. By developing geotextile luggage on the floor or side of the dam, the steadiness of the dam can be more desirable and water go with the flow erosion and erosion can be slowed down.

    Earthwork: Geobags can be used for soil floor reinforcement, slope protection, and reinforcement of defensive layers in earthworks. By filling geotextile luggage and stacking them on slopes or soil surfaces that require reinforcement, the soil's anti-skid and erosion resistance can be increased.

    Video Showcase

     

    Applications

    Geotube is mainly used for Environmental Dredging, Industrial Wastewater Processing, Mining and Mineral Processing ,Agriculture and Municipal Applications.Ecological Restoration、Light Industry, Agriculture&Aquaculture,Breakwater Core,Revetment

    Working Drawing

    xiuhe xiuhe xiuhe xq
    xiuhe xiuhe xiuhe xiuhe

    Slope safety engineering: Geopipe baggage can be used in slope safety engineering. By filling geotextile luggage and arranging them in a sure format on the floor of the slope, the balance of the slope can be increased, and the erosion and erosion of the floor soil can be reduced.

    Land consolidation and greening projects: Geobags can be used for soil conservation and vegetation increase in land consolidation and greening projects. By laying geotextile baggage on plots that require soil retention, soil loss and erosion can be prevented, and a correct boom surroundings can be furnished for plants.

    Other engineering applications: Geopipe luggage can additionally be used for soil safety and engineering solidification in different projects, such as motorway slope protection, railway slicing facet protection, etc.

    Specifications

    Item Test Method Unit GT270PP GT300PP GT350PP GT400PP GT500PP
    Tensile Strength(MD) ASTM D4595 kN/m 55 65 70 80 84
    Tensile Strength(TD) ASTM D4595 kN/m 50 55 70 80 105
    Tensile Elongation(MD/TD) ASTM D4595 % 18 18 18 18 18
    Tensile Strength @2%Strain(MD) ASTM D4595 kN/m 11 13 14 16 16.8
    Tensile Strength @2%Strain(TD) ASTM D4595 kN/m 10 11 14 16 21
    Tensile Strength @5%Strain(MD) ASTM D4595 kN/m 22 26 28 32 33.6
    Tensile Strength @5%Strain(TD) ASTM D4595 kN/m 20 22 28 32 42
    The seam strength ASTM D4884 kN/m 25 27.5 35 40 52.5
    CBR Burst Strength ASTM D6241 kN 5.8 7 8 9.3 10.5
    Pore Size Ogo ASTM D4751 mm 0.43 0.43 0.43 0.43 0.43
    Water Flow Qioo ASTM D4491 L/m2/min 2037 1630 1222 815 611
    U.V.Resistance ASTM D4355 % 80 80 80 80 80
    Weight ASTM D5261 g/m2 270 300 350 400 500

    Pack and Ship

    Packaging: Standard packaging or customer's requirements

    Lead time: Within 10-15 days after receiving the deposit payment

    Producing Capacity: Two 40ft Containers per we

    xiuhe xiuhe

     

Testing equipment

xiuhe

FAQ

Q: What can you buy from us?

A: Geomembrane,Geogrid,Geocell, Geotextile, Geocomposite,

Q: Can I have a sample?

A: Yes. And sample free.

Q: What's the payment terms?

A: T/T or L/C. Others could be negotiated.

Q: What's the delivery time?

A: 3-20 days after confirming order, detail delivery date should be decided according to production season and order quantity.