17(1707026307248).jpg
18(1707026307356).jpg
35(1707026307513).jpg
5(1707026307341).jpg
7(1707026307130).jpg
6(1707026307084).jpg
+
  • 17(1707026307248).jpg
  • 18(1707026307356).jpg
  • 35(1707026307513).jpg
  • 5(1707026307341).jpg
  • 7(1707026307130).jpg
  • 6(1707026307084).jpg

Reinforcement reinforcement Geotextile

PET Nonwoven Geotextile is 100% Polyester continuous filament needle punched nonwoven geotextile, fromed by the process of needle punching and thermally bounding. Lin Yuan Geotextile can offer excellent water flow properties for drainage and other applications.
  • Commodity name: Reinforcement reinforcement Geotextile
  • Description
  • Introduction

    Geotextile is a kind of geotechnical cloth used in fields such as civil engineering, environmental engineering, and hydraulic engineering, usually for the reinforcement, separation, filtration, and safety of soil. The building strategies of geotextiles can differ relying on precise initiatives and requirements. The following are ordinary geotextile building techniques

    Video Showcase

     

    Applications

    Land preparation: Before construction, it is integral to put together the building area, which includes cleaning, leveling the land, eliminating weeds, overseas objects, etc., to make sure the cleanliness and flatness of the building area.

    Embedding geotextile: According to the plan requirements, lay the geotextile on the building area. Geotextiles can be at once laid on the surface of soil or tightly bonded to the soil. Keep the geotextile flat, tight, and evenly unfold to make sure its superb engineering performance.

    Working Drawing

    xiuhe xiuhe xiuhe xiuhe
    xiuhe xiuhe xiuhe xiuhe

    Fixed geotextile: The geotextile desires to be constant to make sure that it does now not shift or loosen. The geotextile can be constant on the soil floor or different constructions the use of fixing strategies such as nails, plastic/metal clips, metal wires, and floor beams.

    Joint connection: If a couple of geotextiles want to be used for overlaying or connecting, joint therapy is required. The joints can be linked by using welding, stitching, or tape to make certain they are company and seamless.

    Monitoring and maintenance: After the set up of geotextiles is completed, monitoring is required to take a look at the engineering overall performance and development first-rate of geotextiles. At the identical time, ordinary renovation and preservation must be carried out to make certain the long-term positive use of geotextiles.

    It must be referred to that the particular steps and techniques of geotextile building are influenced by means of elements such as geotextile type, engineering requirements, and soil conditions. Therefore, in true construction, lifelike changes and operations need to be made in accordance to unique circumstances. At the equal time, applicable security operation requirements ought to be accompanied throughout the building system to make sure the protection of building personnel.

     

    Specifications

    Properties Test Method Unit PETNW150 PETNW200 PETNW250 PETNW300 PETNW350 PETNW400 PETNW500 PETNW600
    Tensile Strength (MD/TD) ASTM D4595 kN/m 9.5 13 17 19 23 26 34 38
    Tensile Elongation (MD/TD) ASTM D4595 % 50 60 60 60 60 60 60 60
    Grab Tensile Strength (MD/TD) ASTM D4632 N 550 730 1000 1100 1400 1700 2000 2500
    Grab Elongation (MD/TD) ASTM D4632 % 50 50 60 60 60 60 60 60
    Trapezoidal Tear Strength (MD/TD) ASTM D4533 N 270 330 430 450 540 610 770 900
    CBR Burst Strength ASTM D6241 N 1800 2300 2800 3200 3600 4500 6000 7000
    Pore Size O90 ASTM D4751 µm 110 110 100 100 90 80 70 70
    Water Flow Q100 ASTM D4491 L/m2/s 235 210 190 170 160 125 100 80
    U.V. Resistance ASTM D4355 %@500h 70 70 70 70 70 70 70 70
    Thickness ASTM D5199 mm 1.2 1.6 1.9 2.2 2.5 2.8 3.4 4.2
    Weight ASTM D5261 g/m2 150 200 250 300 350 400 500 600
    Roll Width - m 6 6 6 6 6 6 6 6
    Roll Length - m 250 150 150 100 100 100 75 50

    Pack and Ship

    Packaging: Standard packaging or customer's requirements

    Lead time: Within 10-15 days after receiving the deposit payment

    Producing Capacity: Two 40ft Containers per week

    xq xiuhe xq xq

Testing equipment

xiuhe

FAQ

Q: What can you buy from us?

A: Geomembrane,Geogrid,Geocell, Geotextile, Geocomposite,

Q: Can I have a sample?

A: Yes. And sample free.

Q: What's the payment terms?

A: T/T or L/C. Others could be negotiated.

Q: What's the delivery time?

A: 3-20 days after confirming order, detail delivery date should be decided according to production season and order quantity.

Certificate

xq

xq

Keywords:

Online Consultation

SUBMIT

Related Products