18(1707026307356).jpg
5(1707026307341).jpg
17(1707026307248).jpg
35(1707026307513).jpg
7(1707026307130).jpg
6(1707026307084).jpg
+
  • 18(1707026307356).jpg
  • 5(1707026307341).jpg
  • 17(1707026307248).jpg
  • 35(1707026307513).jpg
  • 7(1707026307130).jpg
  • 6(1707026307084).jpg

Airport runway Geotextile

PET Nonwoven Geotextile is 100% Polyester continuous filament needle punched nonwoven geotextile, fromed by the process of needle punching and thermally bounding. Lin Yuan Geotextile can offer excellent water flow properties for drainage and other applications.
  • Commodity name: Airport runway Geotextile
  • Description
  • Introduction

    Geotextile is a kind of geotechnical cloth used in fields such as civil engineering, environmental engineering, and hydraulic engineering, normally for the reinforcement, separation, filtration, and safety of soil. The developing methods of geotextiles can fluctuate relying on precise initiatives and requirements. The following are everyday geotextile developing techniques

    Video Showcase

     

    Applications

    Land preparation: Before construction, it is imperative to put jointly the setting up area, which consists of cleaning, leveling the land, disposing of weeds, far-off locations objects, etc., to make high-quality the cleanliness and flatness of the setting up area.

    Embedding geotextile: According to the design requirements, lay the geotextile on the developing area. Geotextiles can be at as quickly as laid on the ground of soil or tightly bonded to the soil. Keep the geotextile flat, tight, and evenly unfold to make sure its extraordinarily appropriate engineering performance.

    Working Drawing

    xiuhe xiuhe xiuhe xiuhe
    xiuhe xiuhe xiuhe xiuhe

    Fixed geotextile: The geotextile wishes to be regular to make sure that it does now now no longer shift or loosen. The geotextile can be everyday on the soil floor or one-of-a-kind constructions the use of fixing methods such as nails, plastic/metal clips, steel wires, and floor beams.

    Joint connection: If a couple of geotextiles prefer to be used for defending or connecting, joint treatment is required. The joints can be linked by the utilization of welding, stitching, or tape to make positive they are corporation and seamless.

    Monitoring and maintenance: After the set up of geotextiles is completed, monitoring is required to take a appear to be at the engineering regular ordinary performance and enchancment superb of geotextiles. At the equal time, everyday renovation and renovation ought to be carried out to make certain the long-term first-class use of geotextiles.

    It ought to be referred to that the particular steps and techniques of geotextile establishing are influenced with the aid of way of capability of elements such as geotextile type, engineering requirements, and soil conditions. Therefore, in actual construction, actual searching changes and operations favor to be made in accordance to extraordinary circumstances. At the equal time, applicable protection operation requirements ought to be accompanied for the period of the setting up system to make nice the security of establishing personnel.

     

    Specifications

    Properties Test Method Unit PETNW150 PETNW200 PETNW250 PETNW300 PETNW350 PETNW400 PETNW500 PETNW600
    Tensile Strength (MD/TD) ASTM D4595 kN/m 9.5 13 17 19 23 26 34 38
    Tensile Elongation (MD/TD) ASTM D4595 % 50 60 60 60 60 60 60 60
    Grab Tensile Strength (MD/TD) ASTM D4632 N 550 730 1000 1100 1400 1700 2000 2500
    Grab Elongation (MD/TD) ASTM D4632 % 50 50 60 60 60 60 60 60
    Trapezoidal Tear Strength (MD/TD) ASTM D4533 N 270 330 430 450 540 610 770 900
    CBR Burst Strength ASTM D6241 N 1800 2300 2800 3200 3600 4500 6000 7000
    Pore Size O90 ASTM D4751 µm 110 110 100 100 90 80 70 70
    Water Flow Q100 ASTM D4491 L/m2/s 235 210 190 170 160 125 100 80
    U.V. Resistance ASTM D4355 %@500h 70 70 70 70 70 70 70 70
    Thickness ASTM D5199 mm 1.2 1.6 1.9 2.2 2.5 2.8 3.4 4.2
    Weight ASTM D5261 g/m2 150 200 250 300 350 400 500 600
    Roll Width - m 6 6 6 6 6 6 6 6
    Roll Length - m 250 150 150 100 100 100 75 50

    Pack and Ship

    Packaging: Standard packaging or customer's requirements

    Lead time: Within 10-15 days after receiving the deposit payment

    Producing Capacity: Two 40ft Containers per week

    xq xiuhe xq xq

Testing equipment

xiuhe

FAQ

Q: What can you buy from us?

A: Geomembrane,Geogrid,Geocell, Geotextile, Geocomposite,

Q: Can I have a sample?

A: Yes. And sample free.

Q: What's the payment terms?

A: T/T or L/C. Others could be negotiated.

Q: What's the delivery time?

A: 3-20 days after confirming order, detail delivery date should be decided according to production season and order quantity.

Certificate

xq

xq

Keywords:

Online Consultation

SUBMIT

Related Products